Payment Center
|
Schedule a Request
Find Us
Search
Menu
Menu
services
Close
Geotechnical
Close
Due Diligence/Planning
Subsurface Exploration
In-Situ Testing
Geophysical Surveys
Deep Foundations
Geotechnical Lab Testing
Karst Evaluations
Design
Geostructural Design
Retaining Wall Design
Earth Retention Systems
Construction
Value Engineering
Instrumentation and Monitoring
Operations + Maintenance
Natural Disaster Evaluations
Construction Materials
Close
Due Diligence/Planning
Bank Draw Reviews
Design
Soil Lime/Cement Mix Design
Construction
Third-Party Code Compliance
Rebound Hammer Testing
Windsor Probe Testing
Magnetic Particle Testing
Liquid Dye Penetrant Testing
Tilt-Up Construction
Geotextile and Geofabric Observations and Testing
Operations + Maintenance
Bank Draw Review
Environmental
Close
Due Diligence + Planning
Brownfields Redevelopment
Expert Witness
Hydrogeologic + Groundwater Services
National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA) and Environmental Impact Assessment (EIA)
Per- and Polyfluoroalkyl Substances (PFAS) Assessment + Monitoring
Phase I ESA
Phase II ESA
Soil + Groundwater Assessments
Vapor Intrusion Evaluation + Mitigation
Industrial Hygiene
Asbestos Hazard Emergency Response Act (AHERA) K-12 Compliance
Asbestos Services
Indoor Air Quality (IAQ) Assessments
HUD Risk Assessments
Lead Paint Surveys
Mold Surveys
Remediation
Remedial Investigations + Feasibility Studies
Remediation Systems
Underground + Aboveground Storage Tanks
Compliance
Air Permitting
Employee Environmental Awareness Training
Emergency Planning and Community Right-to-Know Act (EPCRA)+ Training Solutions
Facility Auditing
Landfill Support Services
National Pollutant Discharge Elimination System (NPDES) Permitting
Resource Conservation and Recovery Act (RCRA) Hazardous + Universal Waste Management
Spill Prevention Plans
Water Solutions Services
Environmental Water
Wastewater + Process Water
Dewatering + Water Transfer
Natural Resources
Biological Habitat Monitoring + Compliance
Dam Removal + Aquatic Habitat Enhancement
Floodplain + Stream Restoration
Threatened and Endangered (T+E) Species + Historic Resources Coordination
Tree + Forest Assessment + Conservation
Watershed Planning
Wetland + Stream Permitting
Wetland Assessment + Delineation
Dam Rehabilitation Design and Engineering
Construction Support
Disaster Response
Excavation Support
Water Treatment System Design
Building Science + Infrastructure
Close
Due Diligence/Planning
Property Condition Assessments (PCAs)
Pavement Asset Management
Building Enclosure Commissioning (BECx)
Accessibility (ADA) Compliance Surveys
Structural Engineering Consulting
Materials Testing
Third Party Inspection Program (TPIP) Services
Design
Document Constructibility and Peer Review
Third Party Plan Review (TPPR)
Accessibility Compliance
Building Enclosure Design (BED)
Roofing Design + Assessments
Construction
Pre and Post Construction Surveys
Bank Draw Review
Building Code Inspections (TPIP)
Full Scale Load Testing
Air Leakage Testing
Construction Quality Assurance Observations (QAO)
Operations + Maintenance
Facility Condition Assessments (FCAs)
Fall Protection, Design, Testing and Certification
Florida Milestone Inspections
Parking Structure Assessments
Property Condition Assessments (PCAs)
Structural Forensics Studies
Asset Management Services
Complementary Services
Close
Materials Science Lab
Multichannel Ground Penetrating Radar (GPR)
Unmanned Aircraft System Services
Disaster Preparedness and Recovery (Coming Soon)
Nondestructive Evaluation
Markets
Close
Commercial
Financial
Government
Close
GSA Schedule
Healthcare
Hotel and Entertainment
Industrial
Digital Infrastructure
Institutional
International Work
Renewables
Close
Solar Farms
Wind Farms
Residential
Retail
Transportation
Utilities
National Accounts
Careers
Close
Current Openings
Become an External Agency
Benefits
Development + Leadership Programs
Employee Announcements
Jobs for Veterans
University Programs
Resources
Close
Projects
Training
Close
Client Webinars
Asbestos Training
Lead Training
Mold Training
Blog
News
Podcast
Press Releases
About Us
Close
ECS History
Safety
Foundation
Awards
Contact Us
Close
Get a Free Quote
Locations
Payment Center
Schedule a Request
Careers
Careers
Search
Find Us
Payment Center
|
Schedule a Request
Back
Home
News
Construction Schedule Slashed in Half for Hokie Housing Project
Construction Schedule Slashed in Half for Hokie Housing Project
Home
News
Construction Schedule Slashed in Half for Hokie Housing Project
December 21, 2021
Back To Top