1812 North Moore Street, Arlington, VA |
![]() Project Description This project consisted of environmental services for an
11-story, 110,000-sf office building constructed in the 1960s. ECS provided daily on-site project management
of all personnel, conducted daily project air monitoring, and completed the
hazardous materials abatement and interior soft demolition in less than eight
weeks. ECS Involvement ·
Performed
a hazardous materials survey to include asbestos, lead-paint, poly-chlorinated
biphenyls, and mercury ·
Conducted
hazardous materials abatement and soft demolition for full interior demolition
including drywall, ceiling tile, mechanical, electrical, and plumbing systems,
and metal and wood components ·
Removed
asbestos of over 100,000-sf of floor tile and mastic, 25,000-lf of pipe
insulation, and 20,000-lf of exterior window/panel casing caulk Project Highlight ·
ECS
achieved an 85 percent recycling rate of waste materials for credit towards a
LEED® Platinum Certification. |