I-895 Connector, Richmond, VA |
![]() Project Description: The ECS Involvement: ·
ECS provided the construction materials Quality Assurance (QA)
testing for the soils, concrete and pavement with full time VDOT certified
inspectors. ·
Periodically, the concrete pours are in excess of 500 yards and
are routinely poured during extended shifts beginning at 2:00am. ·
The project required 286,000 cubic yards of concrete for the
bridge and bridge supports. ·
Approximately 1,000,000 cubic yards of soil will be placed, most
requiring compaction testing ·
The project involves: Ê
Two MSE retaining walls Ê
15 bridge structures spanning primary/secondary roads including I-95,
I-295 and ·
ECS conducted 140 Phase I Environmental Site Assessments (ESA)
in support of right of way acquisitions ·
ECS provided the soils investigations in support of the wetlands
mitigation plan. |