This project involved the complete
development of an approximately 130 acre site on the Engineering Proving Ground
at Fort Belvoir.
The sitework consisted of new roadways, underground utilities,
stormwater management ponds, retaining walls, sidewalks, curbs, guard stations,
and a new four lane bridge over the Accotink Creek.
The project included the
construction of five separate buildings:
·
The
Main Building consists of 2.2M sf of office
space with one level below grade and eight levels above grade on a deep foundation
system with a structural steel frame and curtain wall skin.
·
The
Technology Center consists of a 150,000 sf data
center consisting of four levels above-grade on a deep foundation system with
structural steel frame and combination pre-cast and curtain wall skin.
·
The
Central Utility Plant consists of a 95,000 sf one story building on a deep foundation
system with a structural steel frame and metal panel skin.
·
The
Visitor Control Center
consists of 9,000 sf one story masonry and structural steel frame on a deep foundation
system with a combination of glass and metal panel skin.
·
The
Parking Garage consists of 1.5M sf and a seven level precast parking garage
with accommodations for 5,200 parking spaces.
ECS Involvement
·
Provided
construction materials observation and testing services
·
Served
as contractor quality control in accordance with the U.S. Army Corps of
Engineers certification program
·
Staffed
the project with three field managers, 15 construction materials testing
technicians, three structural steel and welding inspectors, and two
waterproofing and roofing inspectors