The new 175,000ft replacement hospital is being built on an existing parking lot to preserve open space. It features 120 private inpatient rooms, wellness center, meditation room and chapel, as well as a convenient, accessible parking structure specially designed for people with disabilities.

 

Completion of the $55 million hospital occurred in Spring 2006. Construction was in three phases. Phase 1 covered the parking garage, Phase 2 the 120-bed replacement hospital, and Phase 3 the renovation of existing hospital space.

Phase 1 included site utility relocations and temporary surface parking and selective demolition of existing structures. This was done first in order to begin construction of a three-story (four-level), pre-cast concrete parking structure for 517 cars.

 

ECS Involvement:

·         ECS performed construction materials testing for the project including Cast-in-Place concrete, Structural Steel, Fire-Proofing and roofing inspection.

 

 

 